ACM Home Page
Please provide us with feedback. Feedback
Deterministic Processor Scheduling
Full text PdfPdf (2.86 MB)
Source ACM Computing Surveys (CSUR) archive
Volume 9 ,  Issue 3  (September 1977) table of contents
Pages: 173 - 204  
Year of Publication: 1977
ISSN:0360-0300
Author
Mario J. Gonzalez, Jr.  Division of Mathematics, Computer Sciences and System Design, The University of Texas at San Antonio, San Antonio, Texas
Publisher
ACM  New York, NY, USA
Bibliometrics
Downloads (6 Weeks): 13,   Downloads (12 Months): 84,   Citation Count: 41
Additional Information:

references   cited by   index terms   collaborative colleagues  

Tools and Actions: Request Permissions Request Permissions    Review this Article  
DOI Bookmark: Use this link to bookmark this Article: http://doi.acm.org/10.1145/356698.356700
What is a DOI?

REFERENCES

Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.

1
2
3
 
4
BUSSELL, B.; FERNANDEZ, E.; AND LEVY, O. "Optimal scheduhng for homogeneous multiprocessors," m Proc. IFIP Congress 74, North-Holland Publ. Co., Amsterdam, Amencan Elsevier, N.Y., 1974, 286-290.
 
5
BUTEN, R. E.; AND SHEN, V. Y "A scheduling model for computer systems with two classes of processors," in Proc. 1973 Sagamore Computer Conf, on Parallel Processing, Springer-Verlag, N.Y., 1973, 130-138.
 
6
CHANDY, K. M.; AND DICKSON, J. R. "Scheduhng umdentical processors in a stochastic environment," m Proc. IEEE COMPCON 1972, IEEE, N Y, 1972, 171-174.
 
7
 
8
CLARK, D. Scheduhng ~ndependent tasks on non-~dent~cal parallel machines to m~n~m~ze mean flow-t~me, Dept. of Computer Science, Carnegie-Mellon Univ., Pittsburgh, Pa , June 1974.
 
9
 
10
COFFMAN, E G., JR.; AND GRAHAM, R. L "Ophmal scheduhng for two processor systems," Acta Informat~ca 1 (1972), 200-213
 
11
CONWAY, R. W.; MAXWELL, W. L.; AND MILLER, L. W. Theory of schedultng, Addzson-Wesley Publ. Co. Inc, Reading, Mass., 1967.
 
12
FERNANDEZ, E B.; AND BUSSEL, B. "Bounds on the number of processors and time for mulhprocessor optimal schedule," IEEE Trans. Comp C22, 8 (August 1973), 745-751
 
13
FINEBERG, M S ; AND SERLIN, O "Multlprogramming for hybrid computation," in Proc AFIPS 1967 Fall Jt Computer Conf , Thompson Book Co., Washington, D C., 1967, 1-13.
 
14
FuJII, M.; KASAMI, T.; AND NINOMIYA, K. "Optimal sequencing of two eqmvalent processors," SIAM J Appl Math. 17, 4 (July 1969), 784-789.
 
15
Erratum SIAM J. Appl Math. 20, 1 (Jan. 1971), 141.
16
 
17
GRAHAM, R. L. "Bounds for certain multiprocessing anomalies," Bell Syst. Tech. J. 45 (1966), 1563-1581.
 
18
GRAHAM, R. L "Bounds on certain multlprocessmg anomalies," SIAM J Appl. Math 17, 2 (March 1969), 416-429.
 
19
GRAHAM, R L "Bounds on multiprocessing anomahes and packing algorithms," in Proc AFIPS 1972 Spring Jt. Computer Conf., AFIPS Press, Montvale, N.J., 1972, 205-217.
 
20
Hu, T. C. ~'Parallel sequencing and assembly line problems," Operations Research 9, 6 (1961), 841-848.
 
21
JOHNSON, S. M. "Optimal two- and threestage production schedules with setup times included," Nay. Res. Log. Quart. 1, 1 (March 1954).
22
 
23
KAUFMAN, M.T. "An almost-ophmal algorithm for the assembly line scheduhng hne scheduling problem," IEEE Trans. Comp.C- 23, 11 (Nov. 1974), 1169-1174.
 
24
KRONE, M. "Heuristic programming apphed to scheduling models," in Proc Fzflh Annual Princeton Conf. Mathematwal Programming, Princeton Univ. Press, Princeton, N.J., 1971, 193-195
25
26
27
 
28
MCNAUGHTON, R. "Scheduling with deadlines and loss functions," Management Science 6, 1 (Oct. 1969), 1-12.
 
29
MUNTZ, R. R.; AND COFFMAN, E. G. JR. "Optimal preemptive scheduling on twoprocessor systems," IEEE Trans Comp C-18, 11 (Nov. 1969), 1014-1020.
30
 
31
RAMAMOORTHY, C V.; AND GONZALEZ, M j. "A survey of techniques for recognizing parallel processable streams m computer programs," In Proc AFIPS 1969 Fall Jt. Computer Conf., AFIPS Press, Montvale, N.J., 1969, 1-15.
 
32
RAMAMOORTHY, C. V; CHANDY, K M.; AND GONZALEZ, M.d. "Optimal scheduling strategies In a multlprocessor system," IEEE Trans. Comp. C-21, 2 (Feb. 1972), 137-146.
 
33
REDDI, S. S.; AND RAMAMOORTHY, C. V. "Some asp, ects of flow-shop sequencing problem," in t'roc. S~xth Annual Princeton Conf Mathematical Programming, Princeton Unlv. Press, Princeton, N.J., 1972, 650-654.
 
34
 
35
RICHARDS, P. T~m~ng properties of mult~processor systems, Tech. Paper, Rep. No. TD-B60- 27, Technical Operations, Inc., Burhngton, Mass. August 1960.
 
36
SERLIN, O. "Scheduling of time crltlcalprocesses," in Proc. AFIPS 1972 Spring Jt Computer Conf., AFIPS Press, Montva}e, N.J., 1972, 925-932.
 
37
SHEN, V. Y.; AND CHEN, Y.E. "A scheduhng strategy for the flow-shop problem in a system with two classes of processors," in Proc S~xth Annual Princeton Conf. Mathematical Pro- ~ amm~ng, Princeton Univ. Press, Princeton, .J., 1972, 645-649.
 
38
Soil J.W. "Scheduling strategies for periodic jobs in a multiprocessor environment," PhD Dissertation, Computer Sciences Dept., Northwestern Umv., Evanston, Ill. August 1974.
39
 
40
 
41
GONZAL~Z, M. J.; ANY SOH, J W. "Periodic job scheduling m a distributed processor system," IEEE Trans. Aerospace and Electronw Systems AES-12, 5 (Sept. 1976), 530-536.
 
42
COFFMAN, E G., JR. (Ed.), Computer and JsOb-shop scheduling theory, John Wiley & ons, N.Y., 1976
 
43
REDDI, S. S.; AND RAMAMOORTHY, C.V. 'tOn the flow-shop sequencing problem with no walt in process," OperaaonaZ Research Quarterly 23, 3 (Sept 1972), 323-331.
 
44
REDDI, S. S.; AND RAMAMOORTHY, C. V. "A scheduling problem," Operational Research Quarterly 24, 3 (Sept. 1973), 441-446.
 
45
GILMORE, P. C.; AND GOMORY, R. E. "Sequencing a one state-variable machine: A solvable case of the travehng salesman problem," Operations Research (Sept-Oct 1964), 655-679.
 
46
 
47
KOHLER, WALTER H. "A preliminary evaluation of the critical path method for scheduhng tasks on multiprocessor systems," IEEE Trans Comp. (Dec. 1975), 1235-1238.
48
 
49
 
50
COFFMAN, E. G., JR.; AND SETHI, R. "Algorithms minimizing mean flow time: scheduling length properties," Acta Informatica 1 (1976), 1-14.
 
51
EASTMAN, W L.; EVEN, S; AND ISAACS, I. H. "Bounds for the optimal scheduling of n jobs on m processors," Management Science, (Nov. 1964), 268-279.
52
53
 
54
KARP, R.M. "Reducibdlty among combinatorial problems," in Complexity of computercomputation, R. E. Miller and J. W. Thatcher (Eds.), Plenum Press, N.Y., 1972, 85-104.

CITED BY  41

Collaborative Colleagues:
Mario J. Gonzalez, Jr.: colleagues