| A simulation-based backward planning approach for order-release |
| Full text |
Pdf
(912 KB)
|
| Source
|
Winter Simulation Conference
archive
Proceedings of the 29th conference on Winter simulation
table of contents
Atlanta, Georgia, United States
Pages: 765 - 772
Year of Publication: 1997
ISBN:0-7803-4278-X
|
|
Authors
|
|
Edward F. Watson
|
Department of Information Systems and Decision Sciences, Louisiana State University, Baton Rouge, LA
|
|
Deborah J. Medeiros
|
Department of Industrial and Management Systems Engineering, Pennsylvania State University, University Park, PA
|
|
Randall P. Sadowski
|
Simulation Services and Consulting, Systems Modeling Corporation, Sewickley, PA
|
|
| Sponsors |
|
| Publisher |
IEEE Computer Society
Washington, DC, USA
|
| Bibliometrics |
Downloads (6 Weeks): 4, Downloads (12 Months): 20, Citation Count: 4
|
|
|
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Gelders, L. F., and F. V. Van Stellandt. 1980. Design and Implementation of a Production Planning System in a Rolling Mill: A Case Study. AIIE Transactions 12 (1): 54-58.
|
| |
2
|
Harmonosky, C. M., and R P. Sadowski. 1990: The System Generator Concept for FMS Research and Analysis. International Journal of Production Research 28 (3): 559-571.
|
| |
3
|
Maxwell. W., J. A. Muckstadt, L. J. Thomas, and J. VanderEecken. 1983. A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems. Interfaces 13 (6): 92-104.
|
| |
4
|
|
| |
5
|
|
| |
6
|
Pope, D. N., S. R. Courtney, J. P. Autrey, and H. Hsu. 1990. Uses of Simulation in Scheduling Aircraft Manufacturing Operations. Proceedings of the IIE Integrated Systems Conference and Society for Integrated Manufacturing Conference (Institute of Industrial Engineers).
|
| |
7
|
St. John, R. 1984. The Evils of Lot Sizing in MRP. Production and Inventory Management 25 (4).
|
| |
8
|
Toye, C. A. 1990. Let's Update Capacity Requirements Planning Logic. Proceedings of the American Production and Inventory Control Conference. Atlanta, Georgia: American Production and Inventory Control Society.
|
| |
9
|
Watson, E. F., D. J. Medeiros, and R. P. Sadowski. 1995. Order-Release Planning Using Variable Lead Times Based on a Backward Simulation Model. International Journal of Production Research. 1995. 33( 10): 2867-2888.
|
| |
10
|
Watson, E. F. 1993. On Using Backward Simulation to Generate Component Release Plans in a Make-To- Order Environment. Unpublished Phd. Thesis. Pennsylvania State University.
|
| |
11
|
Yunk, N. T. 1981. Computer Simulation Applied to Shop Floor Scheduling and Control. Proceedings of the Fall Industrial Engineering Conference. Institute of Industrial Engineers (eds.).
|
|