ACM Home Page
Please provide us with feedback. Feedback
Digital Library logoTake a look at the new version of this page: [ beta version ]. Tell us what you think.
A simulation-based backward planning approach for order-release
Full text PdfPdf (912 KB)
Source Winter Simulation Conference archive
Proceedings of the 29th conference on Winter simulation table of contents
Atlanta, Georgia, United States
Pages: 765 - 772  
Year of Publication: 1997
ISBN:0-7803-4278-X
Authors
Edward F. Watson  Department of Information Systems and Decision Sciences, Louisiana State University, Baton Rouge, LA
Deborah J. Medeiros  Department of Industrial and Management Systems Engineering, Pennsylvania State University, University Park, PA
Randall P. Sadowski  Simulation Services and Consulting, Systems Modeling Corporation, Sewickley, PA
Sponsors
IEEE-CS : Computer Society
IEEE-SMCS : Systems, Man & Cybernetics Society
ACM: Association for Computing Machinery
INFORMS/CS : Computer Science TC
SIGSIM: ACM Special Interest Group on Simulation and Modeling
SCS : Society for Computer Simulation
ASA : American Statistical Association
IEEE : Institute of Electrical and Electronics Engineers
Publisher
IEEE Computer Society  Washington, DC, USA
Bibliometrics
Downloads (6 Weeks): 4,   Downloads (12 Months): 20,   Citation Count: 4
Additional Information:

references   cited by   index terms   collaborative colleagues  

Tools and Actions: Review this Article  
DOI Bookmark: Use this link to bookmark this Article: http://doi.acm.org/10.1145/268437.268621
What is a DOI?

REFERENCES

Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.

 
1
Gelders, L. F., and F. V. Van Stellandt. 1980. Design and Implementation of a Production Planning System in a Rolling Mill: A Case Study. AIIE Transactions 12 (1): 54-58.
 
2
Harmonosky, C. M., and R P. Sadowski. 1990: The System Generator Concept for FMS Research and Analysis. International Journal of Production Research 28 (3): 559-571.
 
3
Maxwell. W., J. A. Muckstadt, L. J. Thomas, and J. VanderEecken. 1983. A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems. Interfaces 13 (6): 92-104.
 
4
 
5
 
6
Pope, D. N., S. R. Courtney, J. P. Autrey, and H. Hsu. 1990. Uses of Simulation in Scheduling Aircraft Manufacturing Operations. Proceedings of the IIE Integrated Systems Conference and Society for Integrated Manufacturing Conference (Institute of Industrial Engineers).
 
7
St. John, R. 1984. The Evils of Lot Sizing in MRP. Production and Inventory Management 25 (4).
 
8
Toye, C. A. 1990. Let's Update Capacity Requirements Planning Logic. Proceedings of the American Production and Inventory Control Conference. Atlanta, Georgia: American Production and Inventory Control Society.
 
9
Watson, E. F., D. J. Medeiros, and R. P. Sadowski. 1995. Order-Release Planning Using Variable Lead Times Based on a Backward Simulation Model. International Journal of Production Research. 1995. 33( 10): 2867-2888.
 
10
Watson, E. F. 1993. On Using Backward Simulation to Generate Component Release Plans in a Make-To- Order Environment. Unpublished Phd. Thesis. Pennsylvania State University.
 
11
Yunk, N. T. 1981. Computer Simulation Applied to Shop Floor Scheduling and Control. Proceedings of the Fall Industrial Engineering Conference. Institute of Industrial Engineers (eds.).


Collaborative Colleagues:
Edward F. Watson: colleagues
Deborah J. Medeiros: colleagues
Randall P. Sadowski: colleagues