| Simulation-based capacity planning and scheduling with AutoSched |
| Full text |
Pdf
(744 KB)
|
| Source
|
Winter Simulation Conference
archive
Proceedings of the 25th conference on Winter simulation
table of contents
Los Angeles, California, United States
Pages: 255 - 262
Year of Publication: 1993
ISBN:0-7803-1381-X
|
|
Author
|
|
| Sponsors |
|
| Publisher |
|
| Bibliometrics |
Downloads (6 Weeks): 4, Downloads (12 Months): 7, Citation Count: 1
|
|
|
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Thompson, M.B., 1990, ~ "Simulation Based Scheduling" Technical Report # MS90 - 348. Society of Manufacturing Engineers, presented at the international Manufacturing Technology Conference (Chicago, Illinois, Sept. 7).
|
| |
2
|
Rickel, J., 1988 "Issues in the Design of Scheduling Systems," Expert Systems and Intelligent Manufacturing - Michael D. OliffEditor. Elsevier Science Publishing Co., Inc., New York, New York.
|
| |
3
|
Conway, R. W., Maxwell,1967 W.L., and Miller, L. W., Theory of Scheduling. Addison-Wesley, Reading, Mass.
|
| |
4
|
Norman, T. A., 1989 "Tailoring Dispatching Rules for Job Shop Scheduling," A White Paper Developed in the Department of Computer Science at Brigham Young University, Provo, Utah.
|
| |
5
|
Thompson, M.B., 1992, "AutoSched Finited Capacity Scheduling and Planning" A White Paper.
|
| |
6
|
Nichols, J. C., Thompson, M.B., 1993, "The Application of Finited Capactiy Planning and Scheduling toj Semiconductor Testing and Finishing Organizations," first presented at Semocon West '93 sponsered by SEMI (Semiconductor equipment and Materials International)
|
CITED BY
|
|
Hank Czarnecki , Bernard J. Schroer , M. Mizzanur Rahman, Using simulation to schedule manufacturing resources, Proceedings of the 29th conference on Winter simulation, p.750-757, December 07-10, 1997, Atlanta, Georgia, United States
|
|