| Recent advances in the modeling, scheduling and control of flexible automation |
| Full text |
Pdf
(1.53 MB)
|
| Source
|
Winter Simulation Conference
archive
Proceedings of the 25th conference on Winter simulation
table of contents
Los Angeles, California, United States
Pages: 143 - 155
Year of Publication: 1993
ISBN:0-7803-1381-X
|
|
Authors
|
|
Wayne J. Davis
|
Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois
|
|
Duane Setterdahl
|
Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois
|
|
Joseph Macro
|
Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois
|
|
Victor Izokaitis
|
Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois
|
|
Bradley Bauman
|
Department of General Engineering, University of Illinois at Urbana-Champaign, Urbana, Illinois
|
|
| Sponsors |
|
| Publisher |
|
| Bibliometrics |
Downloads (6 Weeks): 9, Downloads (12 Months): 22, Citation Count: 10
|
|
|
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Antonacci, L.A. 1992. Experimentation in Stochastic Compromise Analysis for Real-Time Multi-Criteria Decision Making. An unpublished Masters Thesis, W. J. Davis (advisor), Department of General Engineering, University of Illinois, Urbana, IL.
|
| |
2
|
Davis, W.J. 1992. A Concurrent Computing Algorithm for Real-time Decision Making. Proc. of the ORSA Computer Science and Operations Research: New Developments in their Interfaces Conference, eds. O. Balci, R. Sharda and S. Zenios, 247-266, Pergamon Press, London.
|
| |
3
|
Davis, W. J. and A. T. Jones. 1992. The Application of a Generic Controller in a Multi-Level Production Scheduling and Control Hierarchy. National Institute of Standards and Technology Report NISTIR 4835, Gaithersburg, MD.
|
| |
4
|
Davis, W. J., A. T. Jones and A. Saleh. 1992. A Generic Architecture for Intelligent Control Systems, Computer integrated Manufacturing Systems, 5(2), 105-113.
|
| |
5
|
Davis, W. J. and S. D. Thompson. 1991. Decision-making and Control Schema for Production Planning in CIM Systems, Proc. of the Joint US~German Conf. on New Directions in Operations Research, eds. G. Fendel, Th. Gulledge and A. Jones, 101-125, Springer-Verlag, Berlin.
|
| |
6
|
Davis, W. J. and S.D. Thompson. 1993. A Production Planning and Control Hierarchy using a Generic Controller. To appear in liE Transactions.
|
| |
7
|
Davis, W.J., H. Wang and C. Hsieh. 1991. Experimental Studies in Real-Time, Monte Carlo Simulation, IEEE Systems, Man and Cybernetics, 21(4), 802-814.
|
 |
8
|
|
| |
9
|
Flanders, S.W. 1991. Optimal Sequencing of PartProduction in a Flexible Manufacturing System Using Genetic Algorithms. An unpublished Masters Thesis, W. J. Davis (advisor), Department of General Engineering, University of illinois, Urbana, IL.
|
| |
10
|
Catherine M. Harmonosky, Implementation issues using simulation for real-time scheduling, control, and monitoring, Proceedings of the 22nd conference on Winter simulation, p.595-598, December 09-12, 1990, New Orleans, Louisiana, United States
|
| |
11
|
Eric P. Hedlund , Wayne J. Davis , Peter L. Webster, Using computer simulation to compare tool delivery systems in an FMC, Proceedings of the 22nd conference on Winter simulation, p.641-645, December 09-12, 1990, New Orleans, Louisiana, United States
|
 |
12
|
|
| |
13
|
Thompson, S. D., J. A. Jewell and W.J. Davis. 1992. Issues in Specifying Planning Horizons for Production Planning in CIM Environments. Proc. of the Joint US/ German Conf. on New Directions in Operations Research, eds. G. Fendel, Th. Gulledge and A. Jones, 270-290, Springer-Verlag, Berlin, Germany.
|
| |
14
|
Thompson, S. D., D. T. Watanabe and W. J. Davis. 1993. A Comparative Study of Aggregate Production Planning Strategies under Conditions of Uncertainty and Cyclic Product Demands. To appear in international Journal of Production Research.
|
| |
15
|
Tirpak, T. M., S. M. Daniel, J. D. LaLonde and W. J. Davis. 1992. A Fractal Architecture for Modeling and Controlling Flexible Manufacturing Systems. IEEE Trans. on Systems, Man and Cybernetics, 22(5), 564-567.
|
| |
16
|
Tirpak, T. M., S. J. Deligiannis and W. J. Davis. 1992. Real-Time Scheduling of Flexible Manufacturing. Manufacturing Review (ASME), 5(3), 193-212.
|
CITED BY 10
|
|
Fernando G. Gonzalez , Alicia Helton , Douglas Helton , Jeffrey Smith , Eileen Thompson , Gerry Walterscheild, The design of a solid-state physical model of an automated system to be used as a test bed for control applications, Proceedings of the 32nd conference on Winter simulation, December 10-13, 2000, Orlando, Florida
|
|
|
Joseph G. Macro , Wayne J. Davis , Duane L. Setterdahl, Establishing an object-oriented methodology for the simulation and control of integrated manufacturing systems, Proceedings of the 26th conference on Winter simulation, p.954-961, December 11-14, 1994, Orlando, Florida, United States
|
|
|
Duane L. Setterdahl , Wayne J. Davis , Joseph G. Macro , Edward Barkmeyer, An object-oriented simulation model for communication network traffic at a general mail facility, Proceedings of the 27th conference on Winter simulation, p.988-995, December 03-06, 1995, Arlington, Virginia, United States
|
|
|
Wayne J. Davis , Joseph G. Macro , Andrew L. Brook , Michael S. Lee , Guoyan S. Zhou, Developing a real-time emulation/simulation capability for the control architecture to the RAMP FMS, Proceedings of the 28th conference on Winter simulation, p.171-178, December 08-11, 1996, Coronado, California, United States
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wayne J. Davis , Andrew C. Sieveking , Scott V. Vifquain , Fernando G. Gonzalez , Joseph G. Macro, Hyper-linked applications and its evolving needs for future simulation capabilities, Proceedings of the 27th conference on Winter simulation, p.186-193, December 03-06, 1995, Arlington, Virginia, United States
|
|
|
|
|