|
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
|
| |
2
|
Banks, J., E. Aviles, J.R. McLaughlin, and R.C. Yuan. 1991. The simulator: new member of the simulation family. Interfaces. 21, 76-86.
|
 |
3
|
|
| |
4
|
Directory of Simulation Software. 1991. Elliot Estrine (Ed.), Society for Computer Simulation, 2.
|
| |
5
|
|
| |
6
|
Gupta, M. 1990. An evaluation of operations planning and scheduling problem in advanced manufacturing systems. Ph.D. Dissertation, Department of Industrial Engineering, University of Louisville, Louisville, KY.
|
| |
7
|
|
| |
8
|
Herald, M.J. and S.Y. Nof. 1978. The optimal planning of computerized manufacturing system. Report No. 11, School of Industrial Engineering, Purdue University.
|
| |
9
|
|
| |
10
|
|
 |
11
|
|
| |
12
|
|
| |
13
|
|
| |
14
|
|
| |
15
|
|
| |
16
|
Suri, R. 1985. An overview of evaluative models for flexible manufacturing systems. Annals of Operations Research. 3, 13-21.
|
CITED BY
|
|
Gerald W. Evans , William E. Biles , Michael W. Golway, Simulation of advanced manufacturing systems, Proceedings of the 26th conference on Winter simulation, p.141-148, December 11-14, 1994, Orlando, Florida, United States
|
|