| Robust scheduler for grid networks |
| Full text |
Pdf
(303 KB)
|
Source
|
Symposium on Applied Computing
archive
Proceedings of the 2009 ACM symposium on Applied Computing
table of contents
Honolulu, Hawaii
SESSION: Computer networks track
table of contents
Pages 35-39
Year of Publication: 2009
ISBN:978-1-60558-166-8
|
|
Authors
|
|
| Sponsor |
|
| Publisher |
|
| Bibliometrics |
Downloads (6 Weeks): 28, Downloads (12 Months): 84, Citation Count: 0
|
|
|
ABSTRACT
Imprecise input data imposes additional challenges to grid scheduling. This paper introduces a novel scheduler based on fuzzy optimization called IP-FULL-FUZZY which considers uncertainties of both application demands and of resource availability. The effectiveness of the proposed scheduler is compared to those of a non-fuzzy scheduler as well as to those of a fuzzy scheduler which considers only uncertainties of application demands. Results evince the advantages of adopting the proposed scheduler.
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Gabrielle Allen , David Angulo , Ian Foster , Gerd Lanfermann , Chuang Liu , Thomas Radke , Ed Seidel , John Shalf, The Cactus Worm: Experiments with Dynamic Resource Discovery and Allocation in a Grid Environment, International Journal of High Performance Computing Applications, v.15 n.4, p.345-358, November 2001
[doi> 10.1177/109434200101500402]
|
| |
2
|
D. Antoniades, M. Athanatos, A. Papadogiannakis, E. P. Markatos, and C. Dovrolis. Available Bandwidth Measurements as Simple as Running wget. In Proc. of Passive and Active Measurement Conference (PAM 2006), pages 61--70, 2006.
|
 |
3
|
|
| |
4
|
|
 |
5
|
|
| |
6
|
J. Blythe , S. Jain , E. Deelman , Y. Gil , K. Vahi , A. Mandal , K. Kennedy, Task scheduling strategies for workflow-based applications in grids, Proceedings of the Fifth IEEE International Symposium on Cluster Computing and the Grid (CCGrid'05) - Volume 2, p.759-767, May 09-12, 2005
|
| |
7
|
M. Doar and I. M. Leslie. How Bad is Naive Multicast Routing? In Proc. of IEEE INFOCOM'93, pages 82--89, 1993.
|
| |
8
|
C. Fayad, J. M. Garibaldi, and D. Ouelhadj. Fuzzy Grid Scheduling Using Tabu Search. In Proc. of IEEE Int. Fuzzy Systems Conference, pages 1--6, Jul 2007.
|
| |
9
|
I. González-Rodrígues, C. R. Vela, and J. Puente. A Memetic Approach to Fuzzy Job Shop Based on Expectation Model. In Proc. of IEEE Int. Fuzzy Systems Conference, pages 7--12, Jul 2007.
|
 |
10
|
|
| |
11
|
NASA. Applications of Montage. http://montage.ipac.caltech.edu/applications.html. Accessed at July 6, 2008.
|
| |
12
|
|
| |
13
|
|
| |
14
|
|
|