REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Albrecht, A.J. Measuring application development productivity. GUIDE/SHARE Application Development Symposium Proceedings (Oct. 1979), pp. 83-92.
|
| |
2
|
Aron, J.D. Estimating resources tor large programming systems. In Software Engineering: Concepts and Techniques, J.M. Buxton, et al. Eds. 1976, Litton Educational Publishing, Inc.
|
| |
3
|
Benbasat, I. and Vessey, 1. Programmer and analyst time/cost esti~ mation. MIS Q. (June, 1980), 30- 43.
|
| |
4
|
|
| |
5
|
Boehm, B.W. Software engineering economics. IEEE Trans. Softw. Eng. (Jan. 1984), 4-21.
|
| |
6
|
Computer Associates. CA- ESTIMACS : An Applications Development Project Estimation System. Computer Associates, Mt. Laurel, NJ., 1987.
|
| |
7
|
|
| |
8
|
|
| |
9
|
Freiman, F.R. and Park, R.D. PRICE software model--version 3: An overview. In Proceedings of IEEE-PINY workshop on Quantitative Software Models, IEEE Cat. TH0067-9, Oct. 1979, pp. 32-41.
|
| |
10
|
|
| |
11
|
Herd, J.R., Postak, J.N., Russell, W.E. and Stuart, K.R. Software Cost Estimation Study~Study Results. Doty Assoc. Inc., Rockville, Md, Final Tech. Rep. RADC-TR-77-220, Vol. I (of two), June 1977.
|
| |
12
|
Jensen, R.W. An improved macrolevel software development resource estimation model. In Proceedings of the Fifth ISPA Conference (Apr. 1983), pp. 384-389.
|
 |
13
|
|
| |
14
|
Albert L. Lederer , Rajecsh Mirani , Boon Siong Neo , Carol Pollard , Jayesh Prasad , K. Ramamurthy, Information system cost estimating: a management perspective, MIS Quarterly, v.14 n.2, p.159-176, Jun. 1990
[doi> 10.2307/248774]
|
| |
15
|
McCabe, T.J. A complexity measure. IEEE Trans. Softw. Eng. SE-2 (1976), 308-320.
|
| |
16
|
Mohanty, S.N. Software cost estimation: Present and future. Softw.- Pract. Exper., 11, ( 1981), 103-12 I.
|
| |
17
|
Nelson, E.A. Management Hartdbook for the Estimation ~' Computer Pro~ gramming Cost~. System Development Corporation, AD-A648750~ Oct. 3I, 1966.
|
| |
18
|
Putnam, L.H. A general empirical solution to the macro software sizing and estimating problem. IEEE Trans. Softw. Eng. (July 1978), 345- 361.
|
| |
19
|
Rubin, H.A. Macro-estimation of software development parameters: The ESTIMACS system. The Computer Society of the IEEE, Doc. CH 1919-0/83/0000/0109, 1983.
|
 |
20
|
|
| |
21
|
Walston, C.E. and Felix, C.P. A method of programming measurement and estimation. IBM Syst. J. 16, 1 (1977), 54-73.
|
| |
22
|
Wotverton, R.W. The cost of developing large-scale software. IEEE Tram. Comput. (June 1974), 615- 636.
|
CITED BY 13
|
|
Albert L. Lederer , Jayesh Prasad, Perceptual congruence and information systems cost estimating, Proceedings of the 1995 ACM SIGCPR conference on Supporting teams, groups, and learning inside and outside the IS function reinventing IS, p.50-59, April 06-08, 1995, Nashville, Tennessee, United States
|
|
|
Lionel C. Briand , Khaled El Emam , Frank Bomarius, COBRA: a hybrid method for software cost estimation, benchmarking, and risk assessment, Proceedings of the 20th international conference on Software engineering, p.390-399, April 19-25, 1998, Kyoto, Japan
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wilfred W. Wu , Song-Horng Lin , Yea-Yun Cheng , Cheng-Hwai Liou , Jui-Yuan Wu , Yi-Hua Lin , Frederick H. Wu, Changes in MIS research: status and themes from 1989 to 2000, International Journal of Information Systems and Change Management, v.1 n.1, p.3-35, November 2006
|
|
|
|
|
|
|
|
|
Da Yang , Qing Wang , Mingshu Li , Ye Yang , Kai Ye , Jing Du, A survey on software cost estimation in the chinese software industry, Proceedings of the Second ACM-IEEE international symposium on Empirical software engineering and measurement, October 09-10, 2008, Kaiserslautern, Germany
|
REVIEW
"Lou Agosta : Reviewer"
The authors report that about one in four data processing projects
is completed at the estimated cost. Of projects costing over $50,000, 63
percent are over budget, whereas 14 percent are under
(p.52). These figures p