ABSTRACT
In semiconductor manufacturing facilities, there is often the need to speed up certain product types. This is usually done by either assigning higher priorities or by reducing due dates. In this paper, we study the effects of accelerating one product type by a tighter due date on the on-time delivery performance of the other products manufactured. It turns out that the results depend on the considered factory, its load, and the accelerated product. As a consequence, it will be hard for production planners to find simple rules of thumb for the effects of accelerating products. In general, detailed simulation experiments will be required.
REFERENCES
Note: OCR errors may be found in this Reference List extracted from the full text article. ACM has opted to expose the complete List rather than only correct and linked references.
| |
1
|
Atherton, L. and R. Atherton. 1995. Wafer Fabrication: Factory Performance and Analysis. Boston: Kluwer.
|
| |
2
|
Fowler, J. and J. Robinson. 1995. Measurement and improvement of manufacturing capacities (MIMAC): Final report. Technical Report 95062861A-TR, SEMATECH, Austin, TX.
|
| |
3
|
Menth, S. 2003. Simulationsstudie zur Abfertigungsdisziplin Operation Due Date (Simulation study about the Operation Due Date dispatch rule, in German). Technical Report, Institute of Computer Science, University of Würzburg.
|
| |
4
|
|
| |
5
|
|
| |
6
|
Rose, O. 2003. Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing. In Proceedings of the 2003 Industrial Engineering Research Conference, May 18--20, Portland, OR.
|
| |
7
|
Wein, L. M. 1988. Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 1(3):115--130.
|
|